50 Arizona Commercial Real Estate Projects to Know in 2027
Arizona's commercial construction pipeline is busy heading into 2027. AZ Big Media recently profiled 50 projects across the state that its editors expect to matter for economic trends, investment, and planning. This guide walks through the highlights by project type and answers the questions people ask most about the list.
Quick facts about the 2027 project list
- Projects profiled: 50
- Original publication: November 18, 2026, by Kyle Backer, in the 2027 issue of PTK magazine
- Cities covered: Phoenix, Tempe, Chandler, Scottsdale, Mesa, Glendale, Goodyear, Buckeye, Peoria, Tucson, Flagstaff, Coolidge, Litchfield Park, and others
- Projects with a stated cost: Two, Alanna Phase I at $117 million and The Wayne at $60 million
Industrial and logistics projects
Warehouse and distribution space makes up one of the largest groups on the list.
- Airpark Logistics Center Phase II (Goodyear): Prologis is developing about 1.43 million square feet, with delivery expected in the first quarter of 2027.
- Burlington Stores Distribution Center (Buckeye): At 2 million square feet, it is the largest single building size the article states.
- VT 303 North (Litchfield Park): VanTrust Real Estate's 1.1 million square foot project has an anticipated delivery in 2027.
- ReDiscover Logistics Park (Phoenix): Barings and ViaWest Group are building four buildings totaling 808,448 square feet.
- Sky Harbor Logistics (Tempe): Lincoln Property Co. is building two buildings totaling about 255,766 square feet.
- Goodyear AirPark Phase I (Goodyear): Six buildings are planned, growing to 7 million square feet at build-out.
Apartments and mixed-use projects
- Alanna (Phoenix): Milhaus and Banyan Residential's project will reach 519 units at build-out. Phase I includes 320 units and a $117 million cost.
- Hub on Campus Tempe (Tempe): A 30-story project from CORE Spaces and Wexford Developments with 818 units and 1,957 beds.
- Revelry (Tempe): Rural & University and Empire Group of Companies are building 533 units in two towers.
- The Wayne (Chandler): Porter Kyle's 100-unit project carries a $60 million cost. Groundbreaking was in Q1 2025 and first units are slated for Q2 2026.
- The Stockman Apartments (Chandler): Kennedy Wilson's project covers 549,138 square feet.
- Trailhead Multifamily Apartments (Peoria): Hines is building the final phase of a 40-acre master plan.
Healthcare and education projects
- Banner Health Center Plus Scottsdale (Scottsdale): Banner Health and NexCore Group are opening a 120,000 square foot center in early 2027, with a 54,000 square foot expansion anticipated.
- ASU Health Headquarters (Phoenix): Arizona State University's 175,000 square foot building welcomes students in Fall 2028.
- The University of Arizona Medical Innovation Building (Phoenix): A seven-story, 202,000 square foot building from the University of Arizona at Phoenix Biomedical Campus.
- Central Arizona College Cultural & Performing Arts Center (Coolidge): A 91,000 square foot center with 1,001 seats.
- Paul and Alice Baker Center for Public Media (Tucson): A 61,500 square foot facility from Arizona Public Media and the University of Arizona that serves 11 Arizona counties.
Offices and headquarters
- Cognite Headquarters (Tempe): Cousins Properties is leasing the ninth floor of Hayden Ferry Lakeside III to Cognite.
- Offerpad Headquarters Office (Tempe): The top floor of The Beam on Farmer will hold Offerpad's 41,160 square foot office.
- Troon Headquarters (Scottsdale): A single-level, 60,650 square foot headquarters from Troon and Stream Realty.
- International Furniture Direct U.S. Headquarters (Glendale): A build-to-suit project from Chicago International Real Estate, about 86,086 square feet with roughly 15,000 square feet of office space.
- Novus Place (Tempe): Arizona State University and Banbury Development's 275,000 square foot project is part of the 355-acre Novus Innovation Corridor.
Public infrastructure and civic projects
- Signal Butte Water Treatment Plant Expansion (Mesa): The City of Mesa's project has Phase I due in December 2026 and Phase II due in early summer 2027. Capacity grows from 24 million to 48 million gallons per day.
- Terminal 3 North 2 Concourse (Phoenix): The City of Phoenix is adding six new gates across 173,000 square feet.
- Tumbleweed Park Pickleball Facility (Chandler): The City of Chandler is building 18 championship courts on 7.2 acres.
Frequently asked questions
How many Arizona commercial real estate projects are on the 2027 list? The AZ Big Media list profiles 50 Arizona commercial real estate projects. It covers industrial, multifamily, healthcare, office, education, and public infrastructure work.
When was the list published and who wrote it? Kyle Backer wrote the article, which AZ Big Media published on November 18, 2026. It also appeared in the 2027 issue of PTK magazine.
Which projects are expected to finish or open in 2027? The article points to several 2027 milestones. Airpark Logistics Center Phase II is set to deliver in the first quarter. Banner Health Center Plus Scottsdale is set to open in early 2027. VT 303 North has an anticipated 2027 delivery. The Ak-Chin Indian Community Administration Building is slated for completion in 2027. Signal Butte Phase II is due in early summer 2027.
Which project is the largest on the list? By single building size stated in the article, the Burlington Stores Distribution Center in Buckeye is largest at 2 million square feet. The Goodyear AirPark Phase I project is the largest in total size, growing to about 7 million square feet across six buildings at build-out.
Which projects list a cost? Only two projects give a cost in the article: Alanna Phase I in Phoenix at $117 million and The Wayne in Chandler at $60 million.
Does the article use outside data or statistics? No. The article does not cite external data. Its information comes from the project profiles.
Where is the ASU Health Headquarters, and when does it open? The ASU Health Headquarters is a 175,000 square foot building in Phoenix. The article says students will be welcomed in Fall 2028.
Who should read this list? Investors, brokers, developers, and local business owners can use it to see where Arizona commercial activity is concentrated. The list is a summary of projects, not investment advice, so confirm details with the developer or a qualified professional before making decisions.
Sources
- AZ Big Media, "50 commercial real estate projects to know in 2027," by Kyle Backer, published November 18, 2026. https://azbigmedia.com/real-estate/50-commercial-real-estate-projects-to-know-in-2027/
- PTK magazine, 2027 issue (referenced in the AZ Big Media article above).
Categories
Recent Posts







YOU DREAM IT...WE FIND IT! Local Insight with Proven Results
Holly Waxman & Britney Waxman | Scottsdale Realtors® |Mother -Daughter | 1% Top Producing Team
7333 E. Doubletree Ranch Road unit 100, Scottsdale, AZ 85258
